Wan Hydroelectric Project

id: wan-hydroelectric-project-264-13629683
title: Wan Hydroelectric Project
text: Wan Hydro Electric project is situated near village Wari of Telhara Taluka in Akola District. This project envisages power generation utilizing/availing irrigation releases for about 333 days means 11 months. The power house with installed Capacity of one unit of 1.5 MW is installed as surface power house at the foot of the Wan Dam. The annual generation is 4.174 Mus. This project is administratively approved by Government of Maharashtra vide Irrigation Department's Resolution No. HBP 1094/(202/
brand slug: wiki
category slug: encyclopedia
description: Dam in Akola
original url: https://en.wikipedia.org/wiki/Wan_Hydroelectric_Project
date created:
date modified: 2022-09-27T14:31:41Z
main entity: {"identifier":"Q48727658","url":"https://www.wikidata.org/entity/Q48727658"}
image: {"content_url":"https://upload.wikimedia.org/wikipedia/commons/4/4e/Wan_hydroelectric_project_wan_dam_akola_chief_engineer_hydro_assistant_engineer_hydro_mpsc.jpg","width":1280,"height":770}
fields total: 13
integrity: 15

Related Entries

Explore Next Part