Tuas South Incineration Plant
id:
tuas-south-incineration-plant-319-9878824
title:
Tuas South Incineration Plant
text:
Tuas South Incineration Plant is the largest waste incineration facility in Singapore. It was commissioned in June 2000. The plant can incinerate 3000 tonns of garbage everyday. The incineration reduces the waste volume by 90%. The plant occupies 10.5 ha of reclaimed land. It was constructed at a cost of S$890 million. The plant also generate 80 MW of electricity.
brand slug:
wiki
category slug:
encyclopedia
description:
Waste incineration facility in Singapore
original url:
https://en.wikipedia.org/wiki/Tuas_South_Incineration_Plant
date created:
date modified:
2023-09-01T08:21:45Z
main entity:
{"identifier":"Q113630077","url":"https://www.wikidata.org/entity/Q113630077"}
image:
fields total:
13
integrity:
14