The precedence diagram method (PDM) is a tool for scheduling activities in a project plan. It is a method of constructing a project schedule network diagram that uses boxes, referred to as nodes, to represent activities and connects them with arrows that show the dependencies. It is also called the activity-on-node (AON) method. Critical tasks, noncritical tasks, and slack time
Shows the relationship of the tasks to each other
Allows for what-if, worst-case, best-case and most likely scenario Ke
brand slug:
wiki
category slug:
encyclopedia
description:
original url:
https://en.wikipedia.org/wiki/Precedence_diagram_method
date created:
date modified:
2023-06-02T05:24:45Z
main entity:
{"identifier":"Q1412575","url":"https://www.wikidata.org/entity/Q1412575"}
image:
{"content_url":"https://upload.wikimedia.org/wikipedia/commons/8/8b/TinhSoDoMangPDM.png","width":3200,"height":1991}
fields total:
13
integrity:
14