Pre-determined overhead rate

id: pre-determined-overhead-rate-318-17535782
title: Pre-determined overhead rate
text: A pre-determined overhead rate is the rate used to apply manufacturing overhead to work-in-process inventory. The pre-determined overhead rate is calculated before the period begins. The first step is to estimate the amount of the activity base that will be required to support operations in the upcoming period. The second step is to estimate the total manufacturing cost at that level of activity. The third step is to compute the predetermined overhead rate by dividing the estimated total manufac
brand slug: wiki
category slug: encyclopedia
description: Rate used to apply manufacturing overhead to work-in-process inventory
original url: https://en.wikipedia.org/wiki/Pre-determined_overhead_rate
date created:
date modified: 2022-02-24T03:02:35Z
main entity: {"identifier":"Q12244043","url":"https://www.wikidata.org/entity/Q12244043"}
image:
fields total: 13
integrity: 14

Related Entries

Explore Next Part