Line 1 (Chengdu Tram)

id: line-1-chengdu-tram-318-4526205
title: Line 1 (Chengdu Tram)
text: Chengdu Tram Line 1 is under planning. It was once named Yizhou Avenue Tram, with a total length of 9.62 kilometers and 16 stations. The route is planned to be laid along Yizhou Avenue, starting from Chengdu South railway station and arriving at Huayang Hualong Bridge. At the beginning of 2015, the route of the Yizhou Avenue tram demonstration line was announced. In mid-2015, the official website of Chengdu Metro issued the "Announcement of the General Contracting Bidding for the Survey and Desi
brand slug: wiki
category slug: encyclopedia
description: Planned tram line in Chengdu, China
original url: https://en.wikipedia.org/wiki/Line_1_(Chengdu_Tram)
date created:
date modified: 2023-08-01T11:23:07Z
main entity: {"identifier":"Q48928419","url":"https://www.wikidata.org/entity/Q48928419"}
image:
fields total: 13
integrity: 14

Related Entries

Explore Next Part