Inaruwa–Kakarvitta Railway Project

id: inaruwa-kakarvitta-railway-project-197-8641409
title: Inaruwa–Kakarvitta Railway Project
text: Inaruwa - Kakarvitta Railway Project is an ongoing railway project in Nepal which is the eastern section of Mechi-Mahakali Electrified Railway Project. The DPR work which was started in 2015 is already completed. The length of the railway line is estimated. 126.763 kilometres (78.767 mi) and estimated cost of this project is calculated 90,028,286,240 Nepali Rupees in 2017. The railway line will run parallel 2 km south of Mahendra Highway. There will be 10 railway stations between Inaruwa to Kaka
brand slug: wiki
category slug: encyclopedia
description: Railway project in Nepal
original url: https://en.wikipedia.org/wiki/Inaruwa%E2%80%93Kakarvitta_Railway_Project
date created:
date modified: 2021-08-06T20:12:04Z
main entity: {"identifier":"Q105438679","url":"https://www.wikidata.org/entity/Q105438679"}
image:
fields total: 13
integrity: 14

Related Entries

Explore Next Part