text: HidroAysén was a controversial megaproject that aimed to build five hydroelectric power plants in Chile's Aysén Region, two on the Baker River and three on the Pascua River. Planned for construction during the 2010s, the project was definitely cancelled by its contractors in November 2017. The total expected installed power was 2,750 MW, generating an average 18,430 gigawatt-hours (66,300 TJ) per year, which corresponds to 21% of Central Interconnected System's (SIC) demand by 2020. A 3,000 high