Genale Dawa III Hydroelectric Power Station

id: genale-dawa-iii-hydroelectric-power-station-265-5953707
title: Genale Dawa III Hydroelectric Power Station
text: The Genale Dawa III Power Station, also GD-3 Power Station, is a hydroelectric power station across the Ganale Doria River in Ethiopia. Construction began circa March 2011 and the power station was commercially commissioned in February 2020. The renewable energy infrastructure development is owned by the government of Ethiopia and was constructed by China Gezhouba Group, a subsidiary of China Energy Engineering Corporation at an estimated cost of £352.7 million, co-financed by the Exim Bank of C
brand slug: wiki
category slug: encyclopedia
description: Power station in Ethiopia
original url: https://en.wikipedia.org/wiki/Genale_Dawa_III_Hydroelectric_Power_Station
date created:
date modified: 2023-09-13T01:36:30Z
main entity: {"identifier":"Q108502649","url":"https://www.wikidata.org/entity/Q108502649"}
image:
fields total: 13
integrity: 14

Related Entries

Explore Next Part