Dual overhead rate

id: dual-overhead-rate-316-13411225
title: Dual overhead rate
text: Dual Overhead Rate Recovery is used in construction contracting as a costing equation for bidding a project, costing an existing project or allocating corporate overhead to multiple divisions of construction work. It produces two rates, 1) Labor / Equipment Rate 2) Material / Subcontract Rate. This equation produces a percentage allocation of each class of cost.
brand slug: wiki
category slug: encyclopedia
description:
original url: https://en.wikipedia.org/wiki/Dual_overhead_rate
date created:
date modified: 2023-03-19T02:39:33Z
main entity: {"identifier":"Q5310225","url":"https://www.wikidata.org/entity/Q5310225"}
image:
fields total: 13
integrity: 13

Related Entries

Explore Next Part