Doyang Hydro Electric Project
id:
doyang-hydro-electric-project-251-5690871
title:
Doyang Hydro Electric Project
text:
The Doyang Hydro Electric Project is a NTPC NEEPCO owned hydro power project situated on the River Doyang located in the Wokha District of Nagaland. It was commissioned in the year 2000 and the total installed capacity of the project is 75 MW. In the decades since its commissioning, the project has fallen into disrepair. The hydro power project has maintained a housing colony for the employees since its inception. As the state steadily withdraws from public sector enterprises, the maintenance an
brand slug:
wiki
category slug:
encyclopedia
description:
Abandoned Hydro Power Project in Nagaland, India
original url:
https://en.wikipedia.org/wiki/Doyang_Hydro_Electric_Project
date created:
date modified:
2024-02-20T15:55:56Z
main entity:
{"identifier":"Q56368411","url":"https://www.wikidata.org/entity/Q56368411"}
image:
fields total:
13
integrity:
14