Crown King Branch
id:
crown-king-branch-317-345306
title:
Crown King Branch
text:
Completed in 1904, the Crown King Branch of the Bradshaw Mountain Railroad, also known as Murphy's Impossible Railroad, linked the town of Crown King with the end of the Prescott and Eastern Railroad at Mayer, Arizona. Frank Murphy began construction of the standard gauge railway in 1895. Construction was completed in 1904 when it reached Crown King. The tracks were torn up in 1927, leaving what is now known as FR 259. The railroad got its name from the fact that Crown King is 2,000 feet higher
brand slug:
wiki
category slug:
encyclopedia
description:
original url:
https://en.wikipedia.org/wiki/Crown_King_Branch
date created:
date modified:
2021-02-17T13:35:50Z
main entity:
{"identifier":"Q5189393","url":"https://www.wikidata.org/entity/Q5189393"}
image:
{"content_url":"https://upload.wikimedia.org/wikipedia/commons/d/d3/Crown_King_Branch.jpg","width":2222,"height":2736}
fields total:
13
integrity:
14