Azerbaijan–Georgia–Romania Interconnector

id: azerbaijan-georgia-romania-interconnector-313-13709802
title: Azerbaijan–Georgia–Romania Interconnector
text: The Azerbaijan–Georgia–Romania Interconnector (AGRI) is a proposed project to transport Azerbaijani natural gas to Romania and further to Central Europe. Natural gas would be transported by the pipeline from Sangachal Terminal in Azerbaijan to the Kulevi Terminal at the Black Sea coast of Georgia. In Kulevi, the liquefied natural gas export terminal would be built. Liquefied natural gas will be transported by LNG tankers to the Constanța terminal in Romania. After regasification natural gas will
brand slug: wiki
category slug: encyclopedia
description:
original url: https://en.wikipedia.org/wiki/Azerbaijan%E2%80%93Georgia%E2%80%93Romania_Interconnector
date created:
date modified: 2022-12-03T12:35:44Z
main entity: {"identifier":"Q292345","url":"https://www.wikidata.org/entity/Q292345"}
image:
fields total: 13
integrity: 13

Related Entries

Explore Next Part