Ambala–Chandigarh Expressway
id:
ambala-chandigarh-expressway-308-7981364
title:
Ambala–Chandigarh Expressway
text:
Ambala Chandigarh Expressway is four-lane 35 km long, high-traffic density corridor of Ambala-Chandigarh section on BOT basis, was completed in 30 months at a cost of ₹2.98 billion (US$37 million) The expressway has been operational since December 2009 and was constructed by the GMR Group with assistance from the World Bank. 38 km south of Ambala at existing NH152 (Ambala-Pehowa-Narwana-Fatehabad-Sirsa), it connects with the controlled access tolled Ambala–Narnaul Expressway.
brand slug:
wiki
category slug:
encyclopedia
description:
Road in India
original url:
https://en.wikipedia.org/wiki/Ambala%E2%80%93Chandigarh_Expressway
date created:
date modified:
2023-08-19T14:25:57Z
main entity:
{"identifier":"Q4740954","url":"https://www.wikidata.org/entity/Q4740954"}
image:
fields total:
13
integrity:
14